Control system for nr.1 superheated steam boiler with condensate treatment, water deaeration and fuel gas conditioning skid.

SIL3 BMS system monitors of all safety trips of boiler and burners logics (pre-purge, light-off, shutdown, etc.) as per NFPA normative. BCS system is dedicated to process control for all utilities (boiler, condensate treatment, dearator, fuel gas conditioning skid) and burners combustion control.

Country: United Arab Emirates
Delivery date: 04/2012 - 05/2014
Field: Oil and Gas
Supply description:
Nr.1 Burner Management System (BMS)
Nr.1 Boiler Control System (BCS)
Nr.1 Marshalling cabinet
DCS ABB 800xA system
Automation engineering documents and electrical documents
Automation software applications
Controllers & Supervision:
BMS: Redundant ABB AC800M PM865, redundant S800 SIL3 I/O cards
BCS: Redundant ABB AC800M PM861, redundant S800 I/O cards
ABB 800xA 5.1 FP4 with redundant Aspect/Connectivity/Domain servers and Information Manager servers

SYSTEM ARCHITECTURE

All field instruments are installed in hazardous area; all signals to/from field are isolated with Pepperl & Fuchs ATEX barriers. All nodes (controllers, servers and operator workplaces) are connected with redundant Ethernet LAN (control network), equipped with redundant network managed switches by Hirschmann. Servers, client workstations and network switches are installed into two different rack panels, in separate buildings, connected with redundant fiber optics. The time synchronization on control network is granted with one central GPS time server.